top of page
DEP landing hero copy.jpg
Depcom logo repowering - white.png
gray koch.png

Don’t Let a Natural Disaster
Impact Revenue

Recover Faster

DEPCOM Power brings PV restoration expertise to minimize downtime and production losses. 

Download our case studies to see how.

Fire Badge.png
Flood Badge.png
Wind Badge.png

Download our case studies to learn how to:

DEPCOM-ICONS-03262022_Plan de travail 1 copie 13.png

Limit losses with fast, expert mobilization

DEPCOM-ICONS-03262022_Plan de travail 1 copie 24.png

Manage insurance claims
 

DEPCOM-ICONS-03262022_Plan de travail 1 copie 12.png

Balance production with restoration

DEPCOM-ICONS-03262022_Plan de travail 1 copie 14.png

Blend original and new solar technologies

DEPCOM-ICONS-03262022_Plan de travail 1 copie 17.png

Mitigate component risks
 

DEPCOM-ICONS-03262022_Plan de travail 1 copie 2.png

Optimize plant performance post recovery

Average solar loss due to traditional natural catastrophes was almost 2400% higher than non-weather-related solar loss in 2019*.

When floods recede and winds die down, DEPCOM’s expert restoration teams are ready to optimize your utility solar assets back to peak performance and profitability.

Having designed, built and operated 1.5 GW of U.S. solar plants and restored hundreds of megawatts of solar plants, DEPCOM’s combined EPC/O&M and recovery expertise helps limit the revenue impact of natural disaster events.

*Source: “Hail or High Water: The rising scale of Extreme Weather and Natural Catastrophe losses in Renewable Energy”, GCube Insurance, March 2021 

Restoration Partners at Work_PPE Approved.jpg
Download our case studies

Get actionable strategies to recover faster from disaster.
Anchor 1

Get actionable strategies to recover faster from disaster.

YOUR ONE SOURCE SOLUTION FOR PLANT REPOWERING

Addressing the factors that diminish your plant’s performance:

Energy Storage at CO29 smaller panel cropped.jpg
DEPCOM-ICONS-03262022_Plan de travail 1

Underperforming and difficult to find modules

inverter photo 2 - remove logo.jpg
DEPCOM-ICONS-03262022_Plan de travail 1 copie 17.png

Extraordinary costs from out-of-warranty equipment and downtime

Restoration Partners at Work_PPE Approved smaller.jpg
DEPCOM-ICONS-03262022_Plan de travail 1 copie 2.png

Full-range of repowering EPC support

Energy Storage at CO29 cropped.jpg
DEPCOM-ICONS-03262022_Plan de travail 1 copie 10.png

Turnkey Energy Storage Systems

2022 DEPCOM POWER. All Rights Reserved.
bottom of page